The Westin St. John Resort & Villas

Westin St. John Hotel Company, Inc.
LOCATION

St. John, U.S.V.I.

ARCHITECT

L2 Studios, Inc.

GENERAL CONTRACTOR

Kraus-Manning, Inc. & Wharton Smith, Inc.

About this Project

Phase One, of this multi-phase project, was a total renovation and new design of four existing 4 story buildings that included new interior layouts for 2 and 3 bedroom condominium units and new construction of common areas connecting the buildings with fountains, elevators and service areas.

William R. Nash scopes include Plumbing Sanitary and Domestic Water systems, HVAC Chilled Water Air Conditioning systems with fiberglass and metal ductwork, exhaust and controls. Fire Protection includes fully sprinkled wet pipe system with 2-200HP Fire Pumps, Black Steel and CPVC Blaze Master piping. New Site Work Utilities includes Underground Sanitary piping & Structures, Domestic Water, Fire Protection and Chilled Water serving the four buildings.

Special Features: All work was completed while the rest of the resort was in full operation.

bottom of page